Engineering
The material, corrosion and documentation basis behind each clamp selection.
Materials
PA66-GF, elastomer inserts, carbon steel and stainless options.
Explore →02Corrosion protection
Coating and material choices for onshore, coastal and offshore duty.
Explore →03Standards
DIN 3015, IEC requirements and project-specific design references.
Explore →04Project documentation
Certificates, test reports, drawings and traceability packages.
Explore →Specify by pipe outer diameter (OD) — not nominal bore or NPS. Include OD, wall thickness, medium, operating temperature and pressure in your RFQ. Our engineers confirm the DIN series and insert grade in the first reply.
The HS, LS, TS and SO series are dimensionally standardised to DIN 3015-1 / 2 / 3. Mounting footprints and bolt patterns are interchangeable with other DIN 3015-compliant clamps.
Yes. Product-specific STEP and IGES files are available on request. Submit an engineering inquiry → with the series and OD and we will attach the files to our reply.
Material test reports per EN 10204 3.1 are available for the 316L stainless series (M-400) and can be supplied with the order. Request in the RFQ notes field.
Yes — the EQ Engineered series covers custom geometries, special centre distances and non-standard profiles. Submit a drawing or sketch via the inquiry form; we respond on feasibility within 48 hours and can deliver samples in approximately 6 weeks from drawing approval.
Lead times depend on series, diameter and quantity. Please include your required delivery date in the RFQ and we will confirm stock availability and production schedule in the first reply.
The M-400 marine series is designed to DNV ST-0126 as a design reference. Project-specific DNV type approval can be arranged on request — note this requirement in your inquiry.
We target an engineer reply within 48 hours. The first response confirms DIN reference, material grade, lead time and, where applicable, an indicative unit price. No sales templates — direct engineering reply.
Wind-turbine clamp systems organized around real installation zones, environmental loads and project documentation.